PoC Framework: Difference between revisions
(Created page with "PoC Framework Page Discussion Read Edit View history More TC DATA PoC Framework Document The DATA Proof of Concept (PoC) Framework GS describes the full ISG DATA PoC activity process, roles, responsibilities, acceptance criteria, etc... The latest version of this document can be downloaded here: ETSI TS 104 200 V1.1.1 (2025-11). For convenience of the PoC Teams, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal accepta...") |
m (EDITs) |
||
| Line 1: | Line 1: | ||
== TC DATA PoC Framework Document == | |||
TC DATA PoC Framework Document | |||
The DATA Proof of Concept (PoC) Framework GS describes the full ISG DATA PoC activity process, roles, responsibilities, acceptance criteria, etc... | The DATA Proof of Concept (PoC) Framework GS describes the full ISG DATA PoC activity process, roles, responsibilities, acceptance criteria, etc... | ||
The latest version of this document can be downloaded here: ETSI TS 104 200 V1.1.1 (2025-11). | The latest version of this document can be downloaded here: [https://www.etsi.org/deliver/etsi_ts/104200_104299/104200/01.01.01_60/ts_104200v010101p.pdf ETSI TS 104 200 V1.1.1 (2025-11)]. | ||
For convenience of the PoC Teams, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below. | For convenience of the PoC Teams, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below. | ||
| Line 17: | Line 9: | ||
PoC Proposal Template | PoC Proposal Template | ||
Final Report template | Final Report template | ||
PoC Topics | |||
== PoC Topics == | |||
PoC Projects are expected to be scoped around PoC Topics identified and agreed by TC Data . See details and current list of PoC Topics. | PoC Projects are expected to be scoped around PoC Topics identified and agreed by TC Data . See details and current list of PoC Topics. | ||
Submitting a PoC Proposal | === Submitting a PoC Proposal === | ||
The PoC Team fills in the PoC Proposal template. | The PoC Team fills in the PoC Proposal template. | ||
The PoC Team uploads the completed proposal to the ETSI portal as a contribution to TC DATA. | The PoC Team uploads the completed proposal to the ETSI portal as a contribution to TC DATA. | ||
The PoC Team sends an email to the PoC Review Team. | The PoC Team sends an email to the PoC Review Team. | ||
TC DATA PoC Review Team sends an e-mail containing the link to the proposal to the distribution list '[email protected]' with [DATA ISG PoC Proposal] in the subject line. | TC DATA PoC Review Team sends an e-mail containing the link to the proposal to the distribution list '[email protected]' with [DATA ISG PoC Proposal] in the subject line. | ||
Acceptance Criteria | |||
==== Acceptance Criteria ==== | |||
The criteria for acceptance of DATA ISG PoC Proposals are: | The criteria for acceptance of DATA ISG PoC Proposals are: | ||
The DATA ISG PoC Proposal shall contain the information requested in the format of the DATA ISG PoC Proposal Template of clause A.1 TS 104 200, referred to as the PoC Team. This will be checked by ETSI CTI and the PoC Review Team. | The DATA ISG PoC Proposal shall contain the information requested in the format of the DATA ISG PoC Proposal Template of clause A.1 [https://www.etsi.org/deliver/etsi_ts/104200_104299/104200/01.01.01_60/ts_104200v010101p.pdf TS 104 200], referred to as the PoC Team. This will be checked by ETSI CTI and the PoC Review Team. | ||
The organizations participating in an PoC Team shall include at least two Manufacturers and at least one Network Operator or one Service Provider, where at least one Network Operator or one Service Provider shall be a member of the TC DATA (refer to clause A.1.1 of TS 104 200). | |||
The TC DATA PoC Team proposal shall address at least one goal relevant to TC DATA i.e. related with an TC DATA Use Cases, a Requirement or the suitability of an DATA Architecture aspect (refer to clause A.1.3.1 of TS 104 200).The output of the PoC should provide feedback to the TC DATA that should support the improvement of the output of the existing Work items. Alignment with existing activities is required. | The organizations participating in an PoC Team shall include at least two Manufacturers and at least one Network Operator or one Service Provider, where at least one Network Operator or one Service Provider shall be a member of the TC DATA (refer to clause A.1.1 of [https://www.etsi.org/deliver/etsi_ts/104200_104299/104200/01.01.01_60/ts_104200v010101p.pdf TS 104 200]). | ||
The TC DATA PoC Team proposal shall indicate the venue where the PoC will be demonstrated (e.g. PoC Team member lab, industry trade show, etc.) (refer to clause A.1.5 of TS | |||
A PoC Team project timeline shall be provided (refer to clause A.1.4 of TS 104 200). | The TC DATA PoC Team proposal shall address at least one goal relevant to TC DATA i.e. related with an TC DATA Use Cases, a Requirement or the suitability of an DATA Architecture aspect (refer to clause A.1.3.1 of [https://www.etsi.org/deliver/etsi_ts/104200_104299/104200/01.01.01_60/ts_104200v010101p.pdf TS 104 200]).The output of the PoC should provide feedback to the TC DATA that should support the improvement of the output of the existing Work items. Alignment with existing activities is required. | ||
The TC DATA PoC Team proposal shall indicate the venue where the PoC will be demonstrated (e.g. PoC Team member lab, industry trade show, etc.) (refer to clause A.1.5 of [https://www.etsi.org/deliver/etsi_ts/104200_104299/104200/01.01.01_60/ts_104200v010101p.pdf TS 104 200]). | |||
A PoC Team project timeline shall be provided (refer to clause A.1.4 of [https://www.etsi.org/deliver/etsi_ts/104200_104299/104200/01.01.01_60/ts_104200v010101p.pdf TS 104 200]). | |||
Any TC DATA PoC Proposal which meets these required elements will be accepted. | Any TC DATA PoC Proposal which meets these required elements will be accepted. | ||
CTI support | === CTI support === | ||
The ETSI Center for Testing and Interoperability (CTI) can assist the PoC teams with test expertise, administration and project management. | The ETSI Center for Testing and Interoperability (CTI) can assist the PoC teams with test expertise, administration and project management. | ||
DATA PoC Teams may request CTI assistance by contacting ETSI CTI. | DATA PoC Teams may request CTI assistance by contacting ETSI CTI. | ||
About TC DATA | === About TC DATA === | ||
Within TC DATA all PoC Proposals are presented and reviewed by the ISG; especially the PoC Review Team. | Within TC DATA all PoC Proposals are presented and reviewed by the ISG; especially the PoC Review Team. | ||
PoC Review Team | |||
=== PoC Review Team === | |||
The Volunteers for the PoC review team are: THE TC DATA management team and CTI members. | The Volunteers for the PoC review team are: THE TC DATA management team and CTI members. | ||
Latest revision as of 12:47, 15 January 2026
TC DATA PoC Framework Document
The DATA Proof of Concept (PoC) Framework GS describes the full ISG DATA PoC activity process, roles, responsibilities, acceptance criteria, etc...
The latest version of this document can be downloaded here: ETSI TS 104 200 V1.1.1 (2025-11).
For convenience of the PoC Teams, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below.
Templates
PoC Proposal Template Final Report template
PoC Topics
PoC Projects are expected to be scoped around PoC Topics identified and agreed by TC Data . See details and current list of PoC Topics.
Submitting a PoC Proposal
The PoC Team fills in the PoC Proposal template.
The PoC Team uploads the completed proposal to the ETSI portal as a contribution to TC DATA.
The PoC Team sends an email to the PoC Review Team.
TC DATA PoC Review Team sends an e-mail containing the link to the proposal to the distribution list '[email protected]' with [DATA ISG PoC Proposal] in the subject line.
Acceptance Criteria
The criteria for acceptance of DATA ISG PoC Proposals are:
The DATA ISG PoC Proposal shall contain the information requested in the format of the DATA ISG PoC Proposal Template of clause A.1 TS 104 200, referred to as the PoC Team. This will be checked by ETSI CTI and the PoC Review Team.
The organizations participating in an PoC Team shall include at least two Manufacturers and at least one Network Operator or one Service Provider, where at least one Network Operator or one Service Provider shall be a member of the TC DATA (refer to clause A.1.1 of TS 104 200).
The TC DATA PoC Team proposal shall address at least one goal relevant to TC DATA i.e. related with an TC DATA Use Cases, a Requirement or the suitability of an DATA Architecture aspect (refer to clause A.1.3.1 of TS 104 200).The output of the PoC should provide feedback to the TC DATA that should support the improvement of the output of the existing Work items. Alignment with existing activities is required.
The TC DATA PoC Team proposal shall indicate the venue where the PoC will be demonstrated (e.g. PoC Team member lab, industry trade show, etc.) (refer to clause A.1.5 of TS 104 200).
A PoC Team project timeline shall be provided (refer to clause A.1.4 of TS 104 200).
Any TC DATA PoC Proposal which meets these required elements will be accepted.
CTI support
The ETSI Center for Testing and Interoperability (CTI) can assist the PoC teams with test expertise, administration and project management.
DATA PoC Teams may request CTI assistance by contacting ETSI CTI.
About TC DATA
Within TC DATA all PoC Proposals are presented and reviewed by the ISG; especially the PoC Review Team.
PoC Review Team
The Volunteers for the PoC review team are: THE TC DATA management team and CTI members.